Contractor bid glossary
The words on a bid, explained the way you would to a new hire. Short answer first, then what it means on the job.
- Estimate
- A contractor's written approximation of what a job will cost, given before the work starts. Not a fixed price unless it says so.
- Quote
- A fixed price for a defined scope of work, good for a stated period. Firmer than an estimate.
- Bid
- A contractor's offer to do a specific job for a specific price, submitted in competition with other contractors.
- Proposal
- The document a contractor sends to win a job: scope, price, timeline, terms, and a place for the customer to accept.
- Scope of work
- The list of exactly what the contractor will do on the job, and by implication what they will not.
- Exclusions
- The things a bid specifically says are not included, so the customer does not assume they are.
- Change order
- A written addition or change to a signed job, with its own price, agreed before the extra work is done.
- Allowance
- A dollar amount set aside in a bid for an item the customer has not chosen yet, like tile or fixtures.
- Deposit
- Money the customer pays when they accept the bid, before work starts, usually to cover materials and hold the date.
- Payment terms
- The line on a bid that says when and how the customer pays: the deposit, any progress payments, and the balance.
- Progress payment
- A payment made partway through a longer job at a milestone both sides can see, like rough-in passed or framing complete.
- Balance due
- What is left to pay after the deposit and any progress payments, usually due when the job is done.
- Due on completion
- Payment terms where the whole price, or the balance, is owed the day the work is finished.
- Net 30
- Payment terms that give the customer 30 days after the invoice date to pay. Common in commercial work, rare and risky in residential.
- Invoice
- The request for payment sent after work is done, showing the total, what has been paid, and what is due.
- Receipt
- Confirmation that a payment was received, for the customer's records.
- Markup
- The percentage added to a cost to get the price. A $100 part at 30 percent markup sells for $130.
- Margin
- Profit as a percentage of the price, not of the cost. A $130 price on a $100 cost is a 23 percent margin.
- Overhead
- The costs of running the business that are not tied to one job: truck, insurance, phone, software, tools, licenses.
- Labor rate
- What a contractor charges per hour of work. It carries their pay, their overhead, and profit, not just wages.
- Time and materials
- A pricing method where the customer pays for the hours worked and the materials used, instead of a fixed price.
- Fixed price
- One price for the whole scope, regardless of how many hours it takes. The customer's preferred way to buy.
- Unit price
- A price per unit of work, per square foot, per linear foot, per sheet, used when the final quantity is not known yet.
- Takeoff
- Counting and measuring everything a job needs from the plans or the site: the material list behind the price.
- Contingency
- An amount built into a price, or set aside by the customer, for the things that go wrong that nobody can see yet.
- Warranty
- The contractor's written promise to fix their own work if it fails within a stated time. Separate from the manufacturer's warranty on the product.
- Callback
- A return trip to fix something on a finished job, usually under the warranty, usually unpaid.
- Punch list
- The short list of small items left to finish or fix at the end of a job, walked with the customer before final payment.
- Substantial completion
- The point where the work is usable for its purpose even if small items remain. Often when the big payment comes due.
- Permit
- The city or county's written permission to do work that affects safety or structure, followed by an inspection.
- Inspection
- The city's check of permitted work at set stages, like rough-in and final, before the job can continue or close.
- Lead time
- How long between ordering something and having it on site. Custom windows, doors, and composite decking can run weeks.
- Special order
- Material made or ordered specifically for the job and not returnable: custom windows, cabinets, a particular tile.
- Square (roofing)
- A roofing unit of 100 square feet. A 20-square roof is 2,000 square feet of surface, measured on the slope.
- Linear foot
- Length only, with no width: how fence, gutter, trim, baseboard and countertop are measured and priced.
- Cubic yard
- A volume of 3 by 3 by 3 feet, 27 cubic feet. How concrete, gravel, mulch, soil and fill are ordered.
- Subcontractor
- A contractor hired by another contractor to do part of a job, like the electrician on a remodel run by a general contractor.
- General contractor
- The contractor responsible for the whole job, who hires and coordinates the trades and answers to the customer.
- E-signature
- Accepting a proposal by typing a name or signing on a screen instead of on paper. Legally binding in the US for this kind of agreement.
- Proposal expiration
- The date after which the price on a bid is no longer good, usually 30 days from the date it was sent.
- Good, better, best
- Giving the customer two or three options on one bid, at different prices, so they choose between yours instead of between you and someone else.
- Add-on
- An optional extra on a bid that the customer can tick to include, with its own price, like a gutter guard on a gutter job.
- Rough-in
- The stage where the pipes, wires and ducts are installed inside the walls, before drywall, and inspected.
- Mobilization
- The cost of getting a crew and equipment to a job and set up before any productive work happens.
Put them to work: the bidding guides, estimate templates for 24 trades, and the estimate checker.