Skip to content
BidWriter Pro
Product ▾
How it worksFeaturesSample proposalTry it without signing upPricing
Resources ▾
Guides
What to include in an estimateHow to follow up on an estimateHow much deposit to ask forHow much does Jobber cost?Best estimating apps, with pricesAll 23 guides
Compare
vs Jobbervs Housecall Provs JoistJobber vs Housecall ProJobber vs JoistHousecall Pro vs Joist
Free
Sample estimates, 84 jobsEstimate templates, 24 tradesHourly rate calculatorMarkup vs margin calculatorJob price calculatorDeposit calculator
Company
AboutHelp centerSecurityFor customers
PricingSample
Sign inStart free
Product
How it worksFeaturesSample proposalTry it without signing upPricing
Guides
What to include in an estimateHow to follow up on an estimateHow much deposit to ask forHow much does Jobber cost?Best estimating apps, with pricesAll 23 guides
Compare
vs Jobbervs Housecall Provs JoistJobber vs Housecall ProJobber vs JoistHousecall Pro vs Joist
Free
Sample estimates, 84 jobsEstimate templates, 24 tradesHourly rate calculatorMarkup vs margin calculatorJob price calculatorDeposit calculator
Company
AboutHelp centerSecurityFor customers
Account
Sign inStart free
Last updated October 12, 2026

How to follow up on an estimate without being pushy

Home / Guides

The schedule that gets replies, the three messages to send, and the one thing to never write.

Most unsigned estimates are not rejections. They are a customer who got busy. A follow-up is not nagging, it is the reminder they would have wanted. Here is the schedule and the words.

The schedule

  • Day 3: a short check that it arrived and an offer to answer questions.
  • Day 7: one useful thing, like a start date you can still hold, and the question again.
  • A few days before the price expires: a plain note that the number is good through a date.
  • After that, stop. Three is enough. A fourth message turns a maybe into a no.

Message one, day 3

"Hi Sara, wanted to make sure the water heater estimate did not get buried. Happy to answer anything. Mike."

That is the whole message. No restating the price, no sales pitch, no "just checking in" because everyone writes that. Short, named, signed.

Message two, day 7

"Hi Sara, I can still hold the week of the 20th for the water heater if that works. Any questions on the estimate? Mike."

The hold is the useful part. It gives them a reason to decide now instead of later, and it is true, which is the only kind of urgency worth using.

Message three, before it expires

"Hi Sara, the $2,400 on the water heater is good through Friday. After that I will need to reprice for materials. No pressure either way, just did not want it to lapse on you. Mike."

This one names the number because the deadline is about the number. It also gives them a graceful out, which gets more honest answers than silence.

The one thing never to write

Do not ask "Did you decide?" or "Are you going with someone else?" Both put the customer on the spot and both get ignored. Ask about the job, offer something, and let the yes come to you.

Text or email

Whatever you sent the estimate on. If it went by text, follow up by text. If you emailed it, email, and consider a text for message three because an expiring price deserves the channel they will see today.

If you will not send them

Most contractors know they should follow up and do not, because by day 3 there are four new jobs. If that is you, use a tool that sends the sequence. BidWriter Pro sends these three, in your name, to every emailed proposal, and shows you when the customer opened it so you know whether to text. See what the customer receives, or read why customers go quiet in the first place.

Free, no account: job price calculator, markup vs margin, hourly rate, and 84 sample estimates.

All guides · Why customers don't respond to your estimates · When a customer asks for a discount · How to write a change order that gets accepted the same day · How to ask a customer for a review without it feeling like a form letter · How much does Jobber cost in 2026? · How to write a bid that gets signed · How much deposit should a contractor ask for? · Estimate vs quote vs proposal: which one should you send? · How much does Housecall Pro cost in 2026? · How much does Joist cost in 2026? · What to include in a contractor estimate · How to send an estimate by text message · Estimate vs invoice: what to send and when · How to price a job: a method you can do on your phone · Good, better, best: how to put options on an estimate · Should you charge for estimates? · How to write the warranty line on an estimate · How to get paid faster as a contractor · How to write a scope of work that stops arguments · How to write an estimate on your phone, in the driveway · Eight estimate mistakes that lose jobs · The best estimating apps for small contractors, with what they cost

BidWriter Pro

Professional proposals for contractors who write their own bids. Describe the job, send it, get it signed.

Product

How it worksFeaturesPricingSample proposalHelpSecurityGuidesFree templatesSample estimatesFree toolsvs Jobbervs Housecall Provs JoistJobber alternativesBest estimating appsAbout

By trade

PlumbingElectricalRoofingHVACPaintingLandscapingFlooringConcrete / MasonryCarpentryFencingHandyman / RemodelGeneral Contractor

More trades

DrywallTileGuttersPressure WashingTree ServiceGarage DoorsSepticPest ControlSolarWindows and DoorsSidingDecks

Account

Sign inStart freesupport@getbidwriterpro.com
© 2026 BidWriter Pro LLC · 5900 Balcones Drive, Suite 27439, Austin, TX 78731 · Terms · PrivacyElectronic signatures are legally binding under the U.S. E-SIGN Act.