What an electrical bid has to say, a worked panel upgrade price, the permit and inspection lines that keep you covered, and the deposit terms electricians use.
Electrical customers shop your number against two or three other electricians, and they rarely understand what they are comparing. One bid says "panel upgrade $3,200," another says "200A service, new meter base, permit and inspection, $3,850." The second one wins more often, because it reads like the electrician knows what is behind the wall. The job of your bid is to be that second one.
What an electrical bid has to answer
- The amperage, the breaker count, and the brand or grade of panel. "100A to 200A, 40-space panel" tells the customer what they are getting.
- The wire run: length, how it is routed, and whether it is inside walls or surface. A 60-foot EV circuit through a finished basement is not the same job as 20 feet along a garage wall.
- Whether drywall patching and paint are included. Usually they are not, and the bid should say so before the holes are made.
- Who schedules the utility disconnect and reconnect, who pulls the permit, and when the inspection happens.
How to price it
Example numbers for a 100A to 200A panel upgrade with a new meter base in a typical market. Yours will differ.
- Labor: 8 hours for one electrician at $140 an hour, $1,120. Add a helper for the heavy part of the day if you use one.
- Materials: panel, breakers, meter base, service entrance cable, grounding, fittings. Say $1,400 at cost.
- Markup on materials: 25 to 35 percent. At 30 percent, $420.
- Permit and inspection: $250, on its own line.
- Utility coordination: half an hour of phone calls that you should bill for somewhere. Fold it into labor.
- Total: about $3,190, which rounds to $3,850 once you add the margin a service upgrade carries for the risk of what you find in the old panel. The <a href="/tools/job-price-calculator">job price calculator</a> lays this out for any job.
Smaller jobs, like a ceiling fan circuit or a dedicated 20A line, often go on a flat price you know by heart. Still write the scope. "Add one 20A circuit, 30-foot run, garage to kitchen" prevents the conversation where the customer thought it included moving the fridge.
Where electrical bids go wrong
- The inspection timing was never written, and the customer was surprised the power was off twice.
- Drywall repair was assumed by the customer because nobody said it was excluded.
- A price was given for "a panel" without saying how many spaces. The customer compared it to a 20-space panel from someone else.
- The bid came out of a notebook a week later. By then another electrician had emailed one from the truck.
A finished electrical bid, line by line
Four sample electrical estimates: panel upgrade, EV charger circuit, recessed lighting, and generator inlet and interlock. Each shows the scope lines, the price, and what to spell out on that job. The electrician proposal template is the blank version.
Deposit and payment terms
Half at signing is the common split on panel and service work because the panel and the cable are bought before the visit. On small circuit jobs many electricians take nothing down and collect on completion. If a job waits on a permit, say that the schedule starts when the permit is approved, so the deposit date and the start date are not confused. The deposit calculator turns a percent into a dollar figure for the bid.
Getting more electrical jobs
Electrical customers are often comparing bids by how confident the electrician sounded. A written bid with the amperage, the permit, and the inspection on it does that sounding for you. Send it the same day by text. Follow up once at three days and once at a week; most electrical jobs are signed on the follow-up, not the first read. Keep your license number on every bid, since it is the first thing a careful homeowner looks for.
BidWriter Pro writes the bid from your notes, puts your license on every one, and lets the customer sign and pay the deposit from their phone. $29 a month, 30 days free.
Questions contractors ask
How much should I charge for a panel upgrade?
Build it from labor hours at your rate, the panel and cable at cost plus markup, and the permit on its own line. In many markets a 100A to 200A upgrade with a new meter base runs $2,500 to $4,500 installed. Your local permit and utility fees move it.
Should drywall repair be in an electrical bid?
Only if you do it. Most electricians exclude it and say so in one line. The line is what prevents the argument.
Do I need to mention the inspection?
Yes. Say who schedules it and that the final payment is due after it passes, if that is your practice. The customer plans their week around it.
Write a electrical bid from your notes
Type the job the way you would text it. It comes back as a finished estimate in about five seconds, in your words. No account.
30 days free, then $29 a month. No card to start.
Free, no account: estimate checker, job price calculator, markup vs margin, hourly rate, and 84 sample estimates.
All guides · How to bid plumbing jobs · How to bid roofing jobs · How to bid HVAC jobs · How to bid painting jobs · How to bid landscaping jobs · How to bid handyman jobs · How to bid remodeling jobs · How to bid flooring jobs · How to bid concrete jobs · How to bid fencing jobs · How to bid carpentry jobs · How to bid septic jobs · How to bid drywall jobs · How to bid tile jobs · How to bid gutter jobs · How to bid pressure washing jobs · How to bid tree service jobs · How to bid garage door jobs · How to bid pest control jobs · How to bid solar jobs · How to bid window and door jobs · How to bid siding jobs · How to bid deck jobs · How much does Jobber cost in 2026? · How to write a bid that gets signed · How much deposit should a contractor ask for? · Estimate vs quote vs proposal: which one should you send? · How much does Housecall Pro cost in 2026? · How much does Joist cost in 2026? · How to follow up on an estimate without being pushy · Why customers don't respond to your estimates · What to include in a contractor estimate · How to send an estimate by text message · Estimate vs invoice: what to send and when · How to write a change order that gets accepted the same day · How to price a job: a method you can do on your phone · Good, better, best: how to put options on an estimate · Should you charge for estimates? · How to write the warranty line on an estimate · How to ask a customer for a review without it feeling like a form letter · When a customer asks for a discount · How to get paid faster as a contractor · How to write a scope of work that stops arguments · How to write an estimate on your phone, in the driveway · Eight estimate mistakes that lose jobs · The best estimating apps for small contractors, with what they cost · How much does Kickserv cost in 2026? · How much does Contractor+ cost in 2026? · How much does Markate cost in 2026? · How much does QuoteIQ cost in 2026?