Home / Sample estimates / Electrical

Sample electrical estimate

Panel upgrade estimate example

The utility, the inspector, and the customer all have to show up in the right order, and the bid is where the customer learns that.

Download this estimate as a PDFWrite your own, free
What the electrician typed

"panel upgrade 100a to 200a, new meter base, new mast and weatherhead, grounding to code, afci/gfci breakers where required, permit and utility coord incl"

What the customer got
Reyes Electric
Proposal #2474 · September 13, 2026
Prepared for Angela Brooks
Scope of work
• Replace the 100-amp panel with a new 200-amp panel.
• New meter base, service mast, and weatherhead.
• Grounding and bonding brought to current code.
• AFCI and GFCI breakers where the code requires them.
• Permit, inspection, and utility disconnect and reconnect coordinated by us.
Total
$3,850
Timeline
1 day, after permit approval
Payment
50% upfront, 50% on completion
Warranty: 1 year on all labor and workmanship · Deposit at signing: $1,925
Type your full name to accept this proposal. This is a legally binding electronic signature.
Full name
Accept and pay $1,925 deposit

Example figures for a typical panel upgrade job. Not a quote. Every line on the estimate came from the notes above. Nothing was added.

Write your own panel upgrade estimate

Type the job the way you would text it. It comes out like the one above, in about five seconds. No account needed.

Only what you type goes on the estimate. Nothing gets added.
No account needed to try it.

30 days free, then $29 a month. No card to start. Electrical estimate template · BidWriter Pro for electricians