Home / Sample estimates / Concrete / Masonry

Sample concrete / masonry estimate

Driveway replacement estimate example

Every concrete bid should say the word cracks before the concrete does.

Download this estimate as a PDFWrite your own, free
What the concrete contractor typed

"tear out and replace driveway 20x40, 4 in 3000 psi, #3 rebar 18 oc, broom finish, control joints, haul off old, city permit for approach, no sod repair"

What the customer got
Solid Ground Concrete
Proposal #2474 · September 13, 2026
Prepared for Angela Brooks
Scope of work
• Break out and haul off the existing driveway, 20 by 40 feet.
• New 4-inch, 3,000 PSI concrete driveway with #3 rebar on 18-inch centers.
• Broom finish, control joints cut.
• City permit for the approach included.
• Keep vehicles off for 7 days. Sod repair along the edges is not included.
Total
$9,600
Timeline
3 days plus cure
Payment
50% upfront, 50% on completion
Warranty: 1 year on workmanship. Hairline cracks are normal in concrete and are not a defect. · Deposit at signing: $4,800
Type your full name to accept this proposal. This is a legally binding electronic signature.
Full name
Accept and pay $4,800 deposit

Example figures for a typical driveway replacement job. Not a quote. Every line on the estimate came from the notes above. Nothing was added.

Write your own driveway replacement estimate

Type the job the way you would text it. It comes out like the one above, in about five seconds. No account needed.

Only what you type goes on the estimate. Nothing gets added.
No account needed to try it.

30 days free, then $29 a month. No card to start. Concrete / Masonry estimate template · BidWriter Pro for concrete and masonry contractors